A fire door is only as good as its installation. Even a fully certified FD30 or FD60 door will fail to perform if it is hung badly, sealed wrongly, or fitted into a poor frame. If you are planning an installation, whether for one door or an entire block, this checklist walks through what a proper job should look like.
Why a Proper Installation Checklist Matters
Fire doors are rated as a complete system, the leaf, frame, seals, hinges and hardware all tested together. Swap out one part, fit it slightly wrong, or leave a gap too wide, and the whole system can lose its rating even if the door itself is perfectly good. That is why the process matters just as much as the product.
Building fires in England have increased in recent years, with 40,351 building fires attended by fire and rescue services in the year ending September 2025, a rise of 5.1% on the previous year. Doors fitted correctly the first time are one of the few parts of a building’s fire protection that do not rely on anyone remembering to do anything once installed.
Before the Installation: What to Check First
Site Survey and Door Schedule
A proper job starts with a site survey, not a quote based on a phone call. The installer should check every opening, note the wall construction, measure the existing frame, and record what hardware is already in place. This turns into a door schedule so every opening gets the right specification.
Choosing the Right Fire Rating
Not every door in a building needs the same rating. Flat entrance doors, communal corridors, and plant rooms often call for different fire resistance periods. If you are unsure of the difference between the common ratings, our guide to fire door ratings explained covers FD30, FD60 and where each one is typically required.
The Installation Checklist Step by Step
1. Frame Condition and Fit
The frame must be square, securely fixed, and in good condition before the door goes in. A door hung in a warped or poorly fixed frame will not close and seal correctly, no matter how good the door itself is.
2. Door Leaf and Certification Label
Every door should arrive with a visible certification label or plug confirming its fire rating and the body that tested it. Check this is present and legible before the door is hung, not after.
3. Intumescent and Smoke Seals
Seals need to run continuously around the door or frame with no gaps or breaks. These expand under heat to block the passage of smoke and fire, so a missing section defeats the purpose.
4. Hinges and Self-Closers
Hinges must be fire-rated and correctly specified for the door’s weight and size. The self-closer should shut the door fully and securely from any open position, not just from a few inches ajar.
5. Door Gaps
Gaps between the door and frame typically need to sit within 2 to 4mm on the head and sides, though the exact tolerance depends on the door’s certification. Too wide, and smoke can pass through before the seals activate.
6. Hardware and Signage
Locks, handles and any panic hardware need to be fire-rated and fitted according to the manufacturer’s instructions. Correct signage, such as “Fire Door Keep Shut”, should be fitted once installation is complete.
Questions to Ask Your Fire Door Installer
- Are your engineers trained and certified specifically in fire door installation?
- Will you carry out a full site survey before quoting?
- What certification and documentation will I receive once the work is done?
- Can the existing frame be reused, or will it need replacing?
- Do you offer ongoing maintenance once the doors are installed?
These are the same questions we expect property managers to ask us. Our fire door installation service covers every step from site survey through to certification, so nothing gets missed along the way.
What You Should Receive After Installation
Once the job is finished, you should walk away with more than just a fitted door. A proper installation includes:
- A completion certificate for each door installed
- A written installation report detailing the specification used
- Confirmation of compliance with the relevant British Standards
- Product data sheets for the door, seals and hardware fitted
Under the Regulatory Reform (Fire Safety) Order 2005, the responsible person for a building must ensure fire safety measures, including fire doors, are properly installed and maintained. Keeping this documentation on file is how you demonstrate that duty has been met.
Frequently Asked Questions
What should be checked first before a fire door is installed?
The frame and opening should be checked first. The frame needs to be square, secure, and made from a material suitable for the wall construction, since a rated door fitted into a poor frame will not perform as intended.
What gap should there be around a newly fitted fire door?
Most fire doors need a gap of around 2 to 4mm between the door and the frame on the head and sides, though the exact figure depends on the door’s certification. This is one of the first things to check once installation is complete.
Should I get a certificate after fire door installation?
Yes. A reputable installer will issue a completion certificate for each door along with an installation report confirming the specification used and the work carried out. Keep these on file for compliance and insurance purposes.
Can any builder fit a fire door?
A fire door can only perform to its tested rating if it is fitted correctly, with the right hardware, seals and gaps. It is worth using an installer who is trained and certified specifically in fire door fitting rather than general joinery.
How do I know if an existing frame can be reused?
This depends on the frame’s condition, material and dimensions. A site survey will confirm whether the existing frame meets the requirements for the new door, or whether a full frame replacement is needed to protect the fire rating.
Planning a fire door installation project? Contact Pro Fire Safe for a free site survey and a fixed-price quote covering your London property.