Fire Safety After a Building Refurbishment: What Should Be Reassessed?

A refurbished building may look safer and easier to use, yet work behind the finishes can alter how fire and smoke travel. New partitions, cable runs, ceilings and doors can affect precautions that were recorded in the previous fire risk assessment. Changes in who uses the building may matter just as much as the physical work.

For employers, landlords and property managers, the handover is the right time to check that the completed premises still match the fire strategy and emergency plan. A sign-off for building work and a current fire risk assessment serve different purposes. Both deserve attention before staff, tenants or visitors rely on the new arrangement.

Fire safety assessor reviewing a refurbished commercial corridor and newly installed fire doors

When Does Refurbishment Trigger a Review?

A fire risk assessment must be kept under review and updated when changes could affect its findings. The government’s five-step fire risk assessment checklist specifically asks whether the building has changed since its last assessment. Moving a wall, adding a new use or increasing occupancy can all change the risks.

Do not wait for a routine review date if the refurbishment has altered escape routes, room uses, alarm coverage or fire separation. For work taking place while a building remains occupied, review temporary precautions during the project as well as the finished layout. Temporary exits and contractor storage can change daily.

Check the Finished Layout and Escape Routes

Walk from every occupied room to an exit. Have new meeting rooms, tenant suites or storage spaces lengthened travel routes? Do new access-controlled doors open properly in an emergency? Have partitions hidden an exit sign or changed the visibility of an alarm call point?

Compare the finished layout with the plans used during design and with the previous emergency plan. Count the people who will use each area, including visitors and people who need assistance. A route that was suitable for a small office may need reconsideration after a floor has been divided among several tenants.

Inspect Fire Separation and Hidden Openings

Walls, Floors and Service Routes

Trades may cut openings for electrical cables, data networks, ducts and pipework. If a wall or floor is meant to resist fire, those penetrations need suitable fire stopping. An attractive new ceiling can conceal incomplete work. Ask for records and photographs taken before areas were closed, then investigate gaps where evidence or access is insufficient.

Risks Beyond the Room That Changed

A new extraction route or service riser may connect spaces that were previously separated. Work in a shop below flats can affect residents above. In a block of flats, changes to common parts, the building’s structure, external walls and flat entrance doors may need to be reflected in the assessment. The review should follow the potential path of smoke, not stop at the contractor’s work boundary.

Recheck Fire Doors and Their Hardware

A refurbished floor often has new doors and frames, or existing doors moved into new partitions. Check their specification, installation, labels where applicable, hinges, closers, latches, seals and glazing. Flooring changes can make a door catch or prevent it from shutting. Decorative alterations can also affect the integrity of a door leaf.

Check the door in use, not only on a drawing. It should close properly without someone pushing it into place. Keep installation and inspection records with the building’s fire safety information, and arrange competent inspection where the door’s performance is uncertain.

Test Alarms, Emergency Lighting and Signs

New partitions may leave a detector in the wrong position or create rooms where an alarm is difficult to hear. Lighting changes can leave an escape route dark during a power failure. Review whether signs point towards the current exits, then arrange the appropriate commissioning or functional tests for any altered systems.

If an existing alarm or emergency lighting system has been extended, ask who designed, installed and tested the change. Record any areas outside the new system’s scope. A certificate for one piece of equipment cannot, by itself, show that the whole building’s fire precautions remain suitable.

Update the Emergency Plan and Staff Information

When the layout changes, the old evacuation instructions may direct people to a door that no longer exists. Update floor plans, assembly arrangements, visitor information and any support plans for people needing help. Brief fire wardens and staff on the new routes, then consider a drill to check whether the revised arrangements work in practice.

Where several employers or tenants share a building, agree who controls common stairs, alarms and testing records. Give each party relevant information. The government guidance on responsible persons explains that people with overlapping duties must work together.

Collect Evidence at Handover

Ask the project team for as-built plans, relevant installation and commissioning records, fire-stopping details, door information and notes of any design changes. Record outstanding defects and who will correct them. The responsible person can then review the existing fire risk assessment against the actual building, rather than a proposed plan.

For a wider look at recurring issues, read our guide to common fire safety problems in London buildings. Pro Fire Safe provides fire risk assessments for business premises where a refurbishment has changed the way an office, shop or shared building operates.

Keep Reviewing After Occupation

A post-refurbishment assessment captures conditions at a point in time. Once people move in, furniture, storage, access controls and actual occupancy may differ from the handover plan. Ask staff and tenants to report blocked routes, doors that do not close or alarm problems. Log the action taken and keep the assessment under regular review.

The useful question is simple: can everyone still be warned and reach safety under the completed layout? Checking that question with current records, a walkthrough and competent advice will help turn a finished project into a building that is ready for everyday use.